China Products Suppliers. Y2 Cast Iron Asynchronous AC Electric Three Phase Induction Blower Axial Fan Water Pump Air Compressor Gear Box Motor

China Products Suppliers. Y2 Cast Iron Asynchronous AC Electric Three Phase Induction Blower Axial Fan Water Pump Air Compressor Gear Box Motor

item title:

Y2 Solid Iron Asynchronous AC CZPT Three Stage Induction Blower Axial Enthusiast Drinking water Pump Air Compressor Equipment Box Motor

Item Description:


 

YE2 Sequence Solid of Iron 3 Period Induction Motor is specifically developed for CZPTpean market, whose terminal box is located on
the leading of motor.They are absolutely enclosed and admirer-cooling made. They are newly made in conformity with the relevant
demands / principles of IEC&DIN42673 specifications.
 

Variety
 
YE2 
Electrical power
 
.75~315kw
Insulation
 
F / B, H/B
Voltage and frequency
 
380/400/415/660/690V  50/60hz
Speed
 
3000/1500/1000/750/600 rpm
Mounitng
 
IMB3/IMV1
Cooling and ventilation
 
TEFC in accordance with IC411 of IEC60034-six.
Winding
 
a hundred% Cooper Wire
Protection class
 
IP54/IP55
Vibration
 
vibration class A, vibration class B is CZPT on request.
Quality assurance
 
CZPT
Site conditions
 
 from -15°C t0 +40°C and altitude below 1000 meters

packaging:

Firm Display :

certification

Globally Marketing & Support Network 
CZPT Best Advertising service community is one particular of jinlite motor’s gain. we have 40 branches in china primary city,eight branches in
the Abroad ,Our organization penetrates far more than sixty nations and regions including South The us, North The united states,CZPTpe, Asia
Center East and Africa, Providing us fast get to potential from sales, services, procurement and Transportation since inception, Pinxing
often uphold the growth strategy of marketplace globalization. we segment and placement customers wants and target market place. our
merchandise and support are broadly utilised in international sector, and efficiency secure and basic safety.we custom made different motors for diverse
industries

FAQ

Q: Do you supply OEM support?
A: Indeed

Q: What is your payment time period?

A: thirty% T/T in progress, 70% balance when obtaining B/L copy.  Or irrevocable L/C.

Q: What is your lead time?

A: About 30 days after acquiring deposit or first L/C.

Q: What certifiicates do you have?

A: We have CE, ISO. And we can apply.

 

China Products Suppliers. Y2 Cast Iron Asynchronous AC Electric Three Phase Induction Blower Axial Fan Water Pump Air Compressor Gear Box Motor